|
||
|
Crossler Middle School Youngman Locke Engineers provided structural and civil engineering for this half gym addition to the existing gymnasium. Originally, it was to be designed using CMU blocks but concrete tilt-panel construction proved to be more cost effective. |
||
A shot of the northeast corner during constuction. |
||
|
||
| 1 - 2 - 3 - Close Window |